Skip to content

Wastewater operations

  • ETP
  • STP
  • WTP
  • Advisory only

Real rounds. Real tags. ETP · STP · WTP work, guided step by step.

Every example below uses the tags of our reference effluent treatment plant — the same plant that runs in the live demo. The terminology is the one your operators already use.
T-101P-101BL-102AB-201DP-301CL-401AN-501

Reference plant ETP-01 · lime line = morning inspection round

/01ETP · Equalization

Pump inspections

Walk up to transfer pump P-101 and see drive-end vibration, motor current and discharge pressure with their limits. The routine template asks for seal leakage, bearing temperature and abnormal noise — each step flagged if outside the expected range.

  • DE / NDE bearing vibration (mm/s)
  • Mechanical seal leakage
  • Motor current vs FLA
  • Discharge pressure

/02ETP · Equalization

Tank monitoring

Level, pH and inflow context at the equalization tank. When LT-101 approaches its high limit the alarm reaches the operator on the round — the decision to start a standby pump or divert stays with the control room and procedure.

  • Level (% span)
  • High / high-high limits
  • Freeboard
  • Inflow vs transfer rate

/03Chemical dosing

Chemical dosing observations

Record coagulant pump stroke and speed, calibration-column drawdown, day-tank level and injection-point condition. Hydris records the observation; any dose change is made through the dosing controller by an authorised person.

  • Calibration column drawdown
  • Stroke length / frequency
  • Day-tank level
  • Injection quill condition

/04WTP · Filtration

Filtration & clarification

Check clarifier sludge blanket and effluent turbidity, filter head loss and backwash condition. Turbidity at the clarifier outlet and final analyzer sit side by side so a rising trend is caught before discharge.

  • Turbidity (NTU)
  • Sludge blanket depth
  • Filter head loss
  • Backwash interval

/05Instrumentation

Sensor verification

Compare an online analyzer against a handheld or grab sample at the panel. The reading step stores the manual value with its source next to the online value, so drift is visible in history — not hidden in a logbook.

  • Online vs grab sample
  • Buffer check (pH 4 / 7)
  • Data freshness
  • Quality flag

/06Maintenance

Routine maintenance

Preventive tasks arrive with their checklist: blower filter, belt tension, lubrication points, dosing-pump diaphragm. Each item is ticked with a timestamp; notes and follow-ups go back to the maintenance record in the console.

  • PM checklist
  • Lubrication schedule
  • Belt tension
  • Runtime hours

/07Alarms & faults

Fault documentation

When an alarm fires, the operator on the round sees it first in view. Observations — what was found, what was isolated under permit, what follow-up is needed — are recorded against the alarm and reviewed in the console.

  • Alarm acknowledge → investigate → resolve
  • Notes with timestamps
  • Follow-up work order
  • Audit trail

/08Procedures

SOP guidance

Approved procedures linked to the asset or asset type, shown one step at a time with cautions first. Drafts never reach operators or devices; when a revision is approved, everyone sees the same one.

  • Approved revisions only
  • Caution before step
  • Asset-linked
  • Full-text search in console

Advisory vs control

Hydris informs the operator. Your control system controls the plant.

Hydris does

  • Show live readings, limits and data freshness
  • Raise and route alarms to the right people
  • Guide inspections, rounds and approved SOPs
  • Record observations, readings and checklist items
  • Keep an audit trail of who did what, when

Hydris never

  • Starts, stops or changes the speed of pumps and blowers
  • Opens or closes valves or gates
  • Changes chemical dose rates or setpoints
  • Writes to SCADA, PLCs, DCS or field devices
  • Authorises isolation, permits or lockout / tagout

Map Hydris to your own rounds.

A 30-minute walkthrough: the glasses viewport, the operator console and how your gateway telemetry would reach both. We will be clear about what is available today and what is planned.